The BTO Painting Package, Priced Honestly

Most BTO painting packages in Singapore are priced to win the first phone call — then grow through add-ons: levelling, sealer coats, kitchen walls. Ours is priced the other way. One nett figure for the whole flat, Level 5 dustless resurfacing included, finished in breathable mineral lime paint. Specified correctly. Applied once.

Market Context · Singapore, 2026

What a Painting Package Actually Costs

Before you compare quotes, compare what each quote includes. The market splits into four tiers — and the differences are in the fine print, not the headline number.

Tier Typical Price (Whole Flat) What the Fine Print Says Expected Lifespan
Budget painting ~S$550–1,100 Two coats of acrylic. Wall levelling, sealers, and surface preparation are minimal or absent. Repaint commonly needed in ~2–5 years
Branded premium packages ~S$1,850–2,400 Kitchen walls, sealer coats, and wall levelling typically excluded — each an add-on. Sealer upsells openly promise “5–7 years instead of 2.” ~2–5 years without the upsells
Sons of the Land S$2,488–3,888 nett Level 5 dustless resurfacing included. Whole home, materials and labour, one figure. Nett means nett. A mineral surface that cures into the wall — no repaint cycle by design
Traditional artisan / limewash route ~S$3,800–5,000 Comparable mineral craft, quoted project by project at studio rates. Long-lived when correctly applied

We sit deliberately between the branded packages and the traditional artisan quotes: mineral craft at a fixed, published price — with the levelling work the other tiers sell separately already inside the number. Market figures above are indicative ranges observed across the Singapore market; we name no competitors, and we ask you to check them yourself.

BTO Painting Package Pricing — Whole Home, Nett

Lime paint + Level 5 dustless resurfacing. One figure per flat type. No add-on menu.

3-Room BTO
Whole Home · Nett
S$2,488
Level 5 Dustless Resurfacing included
Studio Recommended
4-Room BTO
Whole Home · Nett
S$3,288
Level 5 Dustless Resurfacing included
5-Room BTO
Whole Home · Nett
S$3,888
Level 5 Dustless Resurfacing included

Nett means nett.

Included: Level 5 dustless wall resurfacing (skim, fill, and mechanical levelling), two-coat mineral lime paint across the whole home, all materials, all labour.
Excluded — and stated now, not at invoice: scaffolding or special access systems (assessed and quoted separately), structural repairs beyond surface resurfacing, and direct-water wet zones, where lime paint is not the correct material.
Required first: a consultation and surface assessment. We do not confirm any package price sight-unseen — the assessment is what makes the figure honest.

Why Pay More Than a Normal Painting Package?

Because the cheap number is not the final number. It is the first instalment.

The repaint cycle

Conventional acrylic jobs in Singapore commonly need repainting within two to five years — the sealer upsells say so themselves, openly promising “5–7 years instead of 2.” A S$900 paint job repeated every three years is not a S$900 paint job. It is a subscription, paid in repaint fees, furniture-moving weekends, and wet-paint smell in a lived-in home. Lime paint does not work that way: it cures by absorbing CO₂ and re-mineralising into the wall itself. There is no film to peel, so there is no cycle to fund.

The wall behind the wardrobe

Acrylic paint seals moisture into a tropical wall. Behind wardrobes and headboards — where air does not move — that trapped humidity becomes mould, bubbling, and peeling, usually discovered years in, usually treated with biocide washes and another coat of the same material that caused it. Lime is breathable: it releases humidity rather than trapping it, and its naturally high pH resists mould without biocides. The wall stays dry because the material lets it.

The exclusions column

Read a typical premium package closely and the pattern repeats: kitchen walls extra, sealer coats extra, wall levelling extra. Levelling is where conventional quotes grow the most — and it is precisely the work a new BTO's joint lines and surface defects demand. In our packages, Level 5 dustless resurfacing is not an add-on. It is the foundation of the system, included in the nett figure, because lime paint on an unlevelled wall is a specification error we refuse to make.

This is, admittedly, not the easiest package to sell. It asks you to pay the true cost once instead of the partial cost repeatedly. We think that is the right way round.

Start Small

You Do Not Have to Decide at S$3,288

Start with a sample kit — S$12, S$19, or S$29 — and brush the mineral onto your own wall, in your own light. Every dollar of the kit is credited in full toward the S$188 site assessment deposit. The assessment, in turn, is what confirms your package price. Each step is small, and each step counts toward the next.

Order a Sample Kit Ask Us on WhatsApp

How a Package Proceeds

Every project begins with a surface assessment — not a sales call. Consultation is required before samples or quotations are confirmed.

01

Consultation Request

02

Surface Assessment & Feasibility Review

03

Samples or Mock-ups (where required)

04

Proposal and Deposit

05

Application, Curing, and Handover

Every system is hand-applied by our own team. That limits how many flats we can take each month — slots are scheduled in order of confirmed assessments, not enquiry date.

BTO Package Questions

How much does a BTO painting package cost in Singapore?

Budget whole-flat painting typically runs ~S$550–1,100. Branded premium paint packages top out around S$1,850–2,400 — usually excluding kitchen walls, sealer coats, and levelling. The traditional artisan limewash route quotes S$3,800–5,000. Our whole-home mineral packages are S$2,488 / S$3,288 / S$3,888 nett for 3-, 4-, and 5-Room flats, levelling included.

What exactly is included?

Level 5 dustless resurfacing, two-coat mineral lime paint across the whole home, materials, and labour. Excluded: scaffolding or special access (quoted separately), structural repairs, and direct-water wet zones. A surface assessment comes before any confirmed price.

Why is it more expensive than normal painting?

Because it includes the work others sell as add-ons — levelling above all — and because the material is different in kind, not just in grade. A mineral surface cures into the wall, breathes, and resists mould naturally. There is no film to peel and no repaint cycle to budget for. You pay the full cost once instead of the partial cost repeatedly.

How long does it take?

It depends on your flat's substrate and the resurfacing required, so we confirm the schedule at assessment rather than promise a number here. Curing is a material process, and we do not compress it to fit a renovation deadline — that is how conventional jobs fail early.

What about bathrooms and kitchens?

Lime paint is not recommended for direct water exposure or heavy abrasion. Packages cover the dry living areas; wet zones are assessed on site and addressed separately where feasible. We would rather tell you where the material does not belong than sell it everywhere.

How does the S$188 deposit work?

The S$188 covers the on-site surface assessment that precedes every quotation. Sample kits (S$12/S$19/S$29) are credited in full toward it — so testing the material first costs you nothing extra on the path to a confirmed package.

One nett price. One application. A wall that does not ask to be repainted.

Or start smaller — order a S$12 sample kit, fully credited toward your assessment deposit.